Which documents ship with a moxa order, by product form, plus the Incoterms we quote.
TrueMoxa · Version 2026-11 · Indicative — the confirmed list is stated on your quotation and proforma invoice.
1. Core documents — every shipment
Document
What it must contain
Who issues it
Commercial invoice
Seller and buyer, HS code, description, quantity, unit price, Incoterm, currency, origin
TrueMoxa
Packing list
Carton count, dimensions, gross/net weight, SKU and lot per carton
TrueMoxa
Bill of lading / AWB
Consignee, notify party, port of loading and discharge, freight terms
Carrier or forwarder
Certificate of origin
Origin criterion; FTA form where the destination allows a preferential rate
CCPIT / customs
Shipping marks
Buyer reference, carton number, gross weight, "made in China"
TrueMoxa, per your artwork
2. Documents by product form
Product form
Test report
Phytosanitary
MSDS
UN38.3
Halal cert
Electrical cert
Dried leaf / moxa wool
Required
Per market
—
—
On request
—
Moxa sticks / cones
Required
Per market
—
—
On request
—
Heat patches
Required
—
—
—
On request
—
Essential oil / balm
Required
—
Required
—
On request
—
Electric warmers
Required
—
Per product
If lithium battery
On request
CE / FCC / plug type per market
"Per market" means the requirement depends on the destination's plant-health or electrical rules — we confirm it at quotation, before production, not after.
3. Incoterms
EXW Qichun — you collect; simplest document set, most work on your side.
FOB Shanghai / Ningbo — our default for LCL and FCL; we handle export clearance to the vessel.
CIF / CFR — on request; freight quoted at booking, not fixed for the year.
DDP — only where we are confident in the destination's import rules. For Indonesia and the Philippines we normally recommend the buyer imports through a licensed local entity.
4. Typical document timeline
Stage
What you receive
When
Quotation
Offer with Incoterm, MOQ, lead time, document list
Within 2 business days of a clear spec
Pre-production
Batch test report (third-party), artwork proof
Before the run starts
Before shipment
Draft invoice, packing list, COO draft
2–3 days before dispatch
Shipment
Final invoice, packing list, COO, test report, B/L
Within 3 days of departure
After arrival
Retention sample reference and lot numbers for your file
With the shipment documents
5. Common reasons a shipment gets held
Invoice description does not match the label on the carton.
HS code quoted for the wrong product form (leaf vs finished stick vs device).
Missing phytosanitary certificate for a raw plant material shipment.
Label language missing (Bahasa Indonesia, Bahasa Malaysia) on a retail-ready carton.
Certificate of origin form that does not match the destination's FTA.
Two things worth doing before your first order.
1. Send your importer's document requirements in writing — we will map them against this list and flag gaps.
2. Confirm the HS code with your broker. We provide a pre-classification for discussion; the binding decision belongs to your customs authority.